Load shedding schedules explained: how to read them and plan around them

How load shedding stages work, why your area’s schedule differs from your neighbour’s, how to read a published schedule, and how to protect appliances and income.

Last reviewed:
13 October 2026
Next review:
13 November 2026
Reading time:
4 min read

The short answer

A load shedding stage describes how much of the national grid has to be shed, and stages run from 1 upwards. Each municipality publishes its own schedule, dividing its area into blocks and rotating them. Your block, not your suburb name, determines your times. The stage can change during a day, so schedules are read from the live source rather than memorised. Nobody can tell you when load shedding will end - any site claiming a future date is guessing.

Load shedding is the one South African schedule that affects almost every household and business, and it is also the one most commonly misread. The two things that cause confusion are the relationship between stages and slots, and the difference between load shedding and a fault.

Stages, and what they actually change

The stage number indicates how much demand must be removed from the grid, in steps of roughly 1 000 MW. A higher stage means more load is removed, which in practice means:

  • more blocks are shed at the same time, and
  • each block is shed more often across a 24-hour cycle.

The stage does not tell you how many times your own block will be off. That depends on your municipality’s schedule, which assigns slots to each block.

StagePractical effect on an area
Stage 1Fewest slots; some blocks may not be affected at all
Stage 2Most blocks shed, typically two to three times a day
Stage 3–4More frequent and often longer slots
Stage 5–6Most of a municipality’s capacity rotated aggressively
Above 6Rare; significant economic disruption

Why your neighbour has different times

Municipalities divide their networks into blocks - sometimes a dozen, sometimes more - and publish a schedule per block. Two suburbs a street apart can sit on different blocks with different slots.

That is why the schedule lookup asks for your suburb or your meter number rather than your street address, and why a neighbour’s list of times is not evidence about yours.

Load shedding versus a fault

This distinction matters because the remedy is different:

Load sheddingFault
ScheduledYes, published in advanceNo
Area affectedAll blocks according to the scheduleUsually smaller, sometimes a single street
RemedyWaitReport it to the municipality - it will not self-resolve
Common causesGrid capacityCable theft, transformer failure, overload

A prolonged outage outside the schedule is almost always a fault, and faults caused by cable theft or overloaded transformers do not fix themselves. Report it through the municipality’s own channel and get a reference number.

What nobody can tell you

No website can tell you when load shedding will end, how long a stage will last, or what the stage will be next month. The position depends on unplanned breakdowns, planned maintenance and demand, and it is announced on the day.

Any page offering a countdown to the end of load shedding is guessing and dressing it up as information. We do not publish predictions, and we do not record a stage as a date record, because it is not a date - it is a live operating condition.

Protecting a household

  • Surge protection at the board where possible, and surge-protected plugs for electronics.
  • Switch off sensitive equipment - computers, televisions, decoders - rather than relying on standby, and unplug during an extended outage.
  • Keep the fridge and freezer closed. A full freezer holds temperature for many hours if the door stays shut.
  • Charge what matters - phones, power banks, and any medical device, with a plan for longer outages.
  • Use a light that survives an outage in a fixed place, so nobody is looking for a torch in the dark.

Protecting a business

Businesses face three problems: equipment damage, lost trading time and cold-chain or process risk.

  • Plan production around the schedule rather than discovering the outage.
  • Get backup power sized for what actually needs it - the till, the network, the lights and the fridge rather than everything.
  • Test the changeover under load, not in theory. An inverter that cannot start a motor is a common and avoidable failure.
  • Communicate with customers. A posted schedule of your own opening arrangements prevents a great deal of frustration.

When the meter is the problem

Prepaid meters bring their own failure modes during load shedding - tokens that do not load, meters that do not reconnect when power returns, and purchases that do not reach the meter. The prepaid meter problems guide covers what to do about each.

Last reviewed 13 October 2026. Schedules are published by Eskom and by each municipal distributor, and the stage is announced on the day. Confirm the current position with your own distributor.

Checklist

  • Find your block number from your municipality or Eskom
  • Save the official schedule page, not a third-party chart
  • Check the stage on the day - it changes without warning
  • Protect the distribution board and sensitive equipment
  • Report an outage that is not on the schedule - it is a fault

Who actually runs this

Eskom and municipal electricity distributors - the national utility and each municipality publish their own schedules

Go to Eskom and municipal electricity distributors (opens in a new tab)

We link out rather than replicate. Find SA Status cannot act on your behalf.

Frequently asked questions

What does each load shedding stage mean?Toggle answer

The stage number indicates how much demand has to be removed from the grid, in steps of roughly 1 000 MW. Stage 2 removes more than stage 1 and means more frequent or longer outages per area over a 24-hour cycle. The number is not a count of outages you will experience - the number of slots your block gets depends on your municipality’s schedule.

Why is my area off when my neighbour is not?Toggle answer

Because your municipality divides its network into blocks, and each block has different time slots. Two adjacent suburbs can be on different blocks with different schedules. The block, not the street address, is what determines your times, which is why your municipality’s schedule lookup asks for your suburb or your meter number.

Can I predict when load shedding will end?Toggle answer

No, and any website that publishes an ending date is guessing. The stage depends on unplanned breakdowns, planned maintenance and demand, and it is announced by Eskom on the day. What you can plan around is the schedule, which tells you when your block is off at a given stage.

Is load shedding the same as a fault?Toggle answer

No. Load shedding is a scheduled, area-wide interruption. A fault is unscheduled and usually affects a smaller area. If your area is off when the schedule says it should be on, check with your municipality - it may be a fault, which is often a cable theft or an overloaded transformer, and it needs to be reported rather than waited out.

How do I protect appliances?Toggle answer

The main risks are the surge when power returns and the repeated cycling that damages compressors and electronics. Surge protection at the distribution board, surge-protected multi-plugs for electronics, and leaving a fridge or freezer sealed during an outage are the practical measures. Deliberately switching off sensitive equipment before the power returns is better than trusting a single device.

Can a website give me a live schedule for my area?Toggle answer

Municipalities and Eskom publish their own schedules, and some provide lookup tools. Anything else is reproducing that data, often with errors or delays. Use your distributor’s own channel for a decision that matters, particularly if you are planning cold-chain storage, a business operation or a medical device.

Sources and verification

Confirmed
Source
eskom.co.za
Source published
Not dated by the source
Last verified by us
13 October 2026
Next scheduled review
13 November 2026

Find SA Status is an independent publisher. We are not a government department and we do not process applications, check statuses on your behalf, or hold any personal information about you. Always confirm time-sensitive information on the official source linked above.

Official sources used on this page

Get deadline reminders by email

One email when a deadline you care about is approaching. No spam, no selling your address, unsubscribe in one click.